2013 WBC Craftsmanship Award
Outstanding Work at DHS Operations Center (DOC)
Power Generation, Distribution and Switchgear

For this 182,000 square foot building, Dynalectric:

  • installed 70,000 feet of four‐ inch conduit with extraordinary coordination efforts. It was carriedout with outstanding precision and craftsmanship, as conduits are held up extremely tight to the structure and pipes/ductwork.
  • powered up five double‐ended substations with all provisions for the future phase of the project within the aggressive eight month schedule.

2012 WBC Craftsmanship Award
Outstanding Work at ACC6 Phase I Data Center
Power Generation, Distribution and Switchgear

The first phase of the 28 megawatt, 220,000 square‐foot data center included the entire building shell with all underground electrical rough‐in, complete site utility package as well as the completion of six collocation rooms. The electrical gear package consisted of:

  • one 1200 amp/35KV outdoor switchgear
  • six 5MVA/35KV/600V outdoor transformers
  • twelve 3000 amp/600V main switchboards
  • twelve 3000 amp critical switchboards
  • twelve parallel isolation switchboards
  • twelve 1300KW rotary UPS line‐ups
  • twelve 2250 KW diesel generators
  • twenty distribution switchboards

2012 WBC Craftsmanship Award
Outstanding Work at Hunton Williams
Lighting Systems

This 180,000 square‐foot space, LEED Gold project consisted of multiple floors build‐out and includes:

  • 9,600 feet of custom linear cove lighting in precise mill work lighting openings
  • over 3,700 fixtures
  • 65 different fixture types and complex dimming system

The project was completed within six months.

2011 WBC Craftsmanship Award
Outstanding Work at ACC5 POD 1115 Buildout
Power Generation, Distribution and Switchgear

This 3‐month Facebook project was for five 10,000 square feet data centers.

We insatalled:

  • 1768 feet of overhead 250 amp Busway
  • 1,688 load tap boxes fed from 66 dual sources 300 kw PDUs for a total of 11.2 MW
  • 37,000 feet of strut
  • 52,000 feet of Allthread

2011 WBC Craftsmanship Award
Outstanding Work at TMF JB Data Center
Power Generation, Distribution and Switchgear

The project required the installation of equipment from the lower garage level to the roof of a judiciary building, without delay or interruption.

We installed:

  • a generator on roof
  • multiple infrastructure UPS
  • distribution panels
  • miles of conduit

2011 WBC Craftsmanship Award
Outstanding Work at Equinix Data Center
Power Generation, Distribution and Switchgear

For this very short, three month project, Dynalectric pulled hundreds of miles of feeders, thousands of terminations and installed hundreds of gear related equipment.

2011 WBC Craftsmanship Award
Outstanding Work at ACC5 Data Center
Power Generation, Distribution and Switchgear

This project overcame tremendous obstacles throughout construction including a subterranean shift of rock plates underneath the structure and a complete four month shutdown on manpower during the first phase.

We utilized:

  • roughly 1.4 million feet of concealed power and communication PVC conduit,
  • 64,000 feet of exposed EMT/GRC,
  • over 2.3 million feet of feeder, branch, control and medium voltage cable,
  • 120,000 feet of strut for support
  • 48,000 feet of all thread rod in various sizes

2011 WBC Craftsmanship Award 
Outstanding Work at Equinix Data Center
Special Systems

Dynalectric installed miles of control and F/A wiring in just a few months. In addition, the project required thousands of feet of Vesda conduit for F/A controls including gear control wiring consisting of generators and multiple UPS and battery monitoring.

2011 WBC Craftsmanship Award
Outstanding Work at ACC5 Data Center
Special Systems

Project was completed on time even though only one week was allowed for the termination of over 1,000 control circuits for each UPS room. Major components of the system consist of distribution boards and volt main switchboards. To reduce downtime during ground fault scenarios, a high resistance ground system (HRG) was used. In the installation of the Isolation Parallel Switchgear/UPS controls and the HRG system, 1,440,000 feet of wire was used for more than 16,000 control circuits.

2011 WBC Craftsmanship Award
Outstanding Work at ACC5 Phase II
Special Systems

The project included the installation and networking of:

  • 10 fire alarm panels
  • 10 graphics annunciators
  • 1,753 smoke detectors
  • 93 heat detectors
  • 14 preaction releasing stations
  • more than 220 audio visual devices
  • 64 ASSD sampling systems

2011 WBC Craftsmanship Award
Outstanding Work at Equinix IBX DC6
Telecommunications System & Facilities

The scope of this project required DynaTran Datacom craftsmen to install multiple fiber and copper backbone systems, along with category 5E UTP cabling for new work area outlets. This alone provided service for hundreds of users, including 150 speakers for a zoned paging system located throughout the facility.